![]() ![]() There was no means of keeping it stable once gravity started to act on it. In photo above, when the chocker was removed from the actuator, the load became eccentric and the CG was outside the anchor points. ![]() Never put on lifting points only on one side of the CG. ![]() Always ensure lifting points are directly above or equally spaced on either side of the Center of Gravity (CG) of the load. Especially, when the assembly is completely unstable and relying only on friction to keep it from rolling.Ģ. If the chocker placement is not correct, lower the load and reset the chokers when the load is on the ground and stable. Fortunately, no personnel were injured, but materials were damaged.ġ. They changed their rigging configuration that was holding the assembly upright without securing the load and the assembly tipped over. In 2015, a Contractor was attempting to up-right a prefabricated valve assembly. A Critical Lift Plan is required when the criteria (listed above) are met for a Critical Lift.īelow is an example of a Critical Lift Plan:Ĭomplex Lift: A non-routine crane lift requiring detailed planning and unusual or additional safety precautions. Critical Lift: A lift that exceeds 75 percent of the rated capacity of the crane or derrick and/or requires the use of more than one crane or derrick.īefore making a critical lift, a pre-lift meeting is conducted to ensure all involved parties understand all aspects of the lift. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |